ONGOING PROJECTS / Installation of the catenary system for the Bursa Emek – City Hospital metro line

Installation of the catenary system for the Bursa Emek – City Hospital metro line
  • Contracting Authority: AYGM
    Main Contractor: Taşyapı Söğüt Joint Venture
    Total Line Length: 6 km

    Personnel:

    • Project Manager: 1
    • Electrical Engineer: 1
    • Technician/Technical Staff: 12
    • Construction Equipment Operator: 3

    Equipment:

    • Construction Equipment: 3
    • Off-road Vehicle: 2

    Contract Duration: 720 days

     