BACK:  

ONGOING PROJECTS / Revision of the Adana-Osmaniye Catenary Line

Revision of the Adana-Osmaniye Catenary Line
  • Administration: AYGM
    Main Contractor: REC International Construction
    Total Line Length: 95 km

    Personnel Structure:

    • Project Manager: 2

    • Electrical Engineer: 1

    • Technician: 15

    • Heavy Equipment Operator: 4

    Equipment:

    • Heavy Machinery: 4

    • Field Vehicle: 4

    Contract Duration: 180 days

  • You can place your orders from the order form below..

Name product : Revision of the Adana-Osmaniye Catenary Line