COMPLETED PROJECTS / Maintenance and Repair of Topkapi-Habibler (T4) Tram Line Electrification Systems

Maintenance and Repair of Topkapi-Habibler (T4) Tram Line Electrification Systems
  • Administration: Metro Istanbul

    Prime Contractor: DEMULAŞ

    Total Line Lenght: 15 km

    Electrical Engineer: 1

    Technician: 12

    Work Machine Operator: 1

    Work Machine: 1

    Pickup: 2

    Contract Duration: 730 Days